By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
News for IndiaNews for IndiaNews for India
  • Home
  • Posts
  • Search Page
  • About us
Reading: NASA Artemis Rocket Launch Rehearsal Terminated At T-5:15; Here’s Why
Share
Font ResizerAa
News for IndiaNews for India
Font ResizerAa
  • Economics
  • Business
  • Home
  • Categories
    • Business
    • Economics
  • About us
  • Sitemap
Follow US
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
News for India > Business > NASA Artemis Rocket Launch Rehearsal Terminated At T-5:15; Here’s Why
Business

NASA Artemis Rocket Launch Rehearsal Terminated At T-5:15; Here’s Why

Last updated: February 3, 2026 12:12 pm
4 months ago
Share
SHARE



NASA cut short the Artemis II wet dress rehearsal shortly before the five-minute mark in the countdown after engineers detected a leak of liquid hydrogen. The issue was traced to a connection at the tail service mast umbilical, where elevated hydrogen levels had already been flagged earlier in the test.  

Teams at the launch control centre are now securing the SLS rocket and emptying its fuel tank, NASA said in a blog post.  

“The Artemis II wet dress rehearsal countdown was terminated at the T-5:15 minute mark due to a liquid hydrogen leak at the interface of the tail service mast umbilical, which had experienced high concentrations of liquid hydrogen earlier in the countdown, as well. The launch control team is working to ensure the SLS (Space Launch System) rocket is in a safe configuration and begin draining its tanks,” NASA said. 

As a countdown enters its terminal stage, automated software assumes command of launch operations and conducts final evaluations of critical hardware. Flight computers, engine bleed mechanisms and ground infrastructure are reviewed as the vehicle transitions to internal power and advances towards a mock engine start, as per NASA. 

Artemis II Wet Dress Rehearsal: Test terminated at T-5:15.

The launch control team is working to ensure the SLS rocket is in a safe configuration and begin draining its tanks.

Learn more: https://t.co/50EqqAAklA

— NASA’s Kennedy Space Center (@NASAKennedy) February 3, 2026

This phase was designed to demonstrate full system readiness for Artemis II, which will mark the Artemis campaign’s first mission carrying astronauts. 

Artemis II is set to become NASA’s first human mission aimed at the Moon since astronauts last flew there during the Apollo programme more than half a century ago. 

Previously, Bloomberg reported that NASA engineers were investigating a propellant line leak that emerged during a critical test of the agency’s lunar rocket on Monday.  

The issue surfaced as NASA carried out a fuelling exercise for the Artemis II mission. 

Teams at the Kennedy Space Center were carrying out fuelling operations designed to replicate the most critical steps of launch day. The test aimed to demonstrate that the Boeing-developed Space Launch System and the Orion spacecraft, produced by Lockheed Martin, can support Artemis II’s planned 10-day lunar fly-by mission and safe return. 

Comprehensive Budget 2026 coverage,
LIVE TV analysis,
Stock Market and
Industry reactions,
Income Tax changes and
Latest News on NDTV Profit.






Source link

You Might Also Like

Did retail give exits to NRIs, some FPIs in Rajesh Exports | Stock Market News

Gold, silver rates today: Comex gold rebounds $76/oz; silver gains $1.7 as Middle East ceasefire hopes revive demand | Stock Market News

Access Denied

Access Denied

Access Denied

TAGGED:ArtemisNASA
Share This Article
Facebook Twitter Email Print
Previous Article India-US Trade Deal Shows Patience Paid Off, Says PM Modi
Next Article Sebi to cut FPI registration time to 5 days in big push for Indian stock markets

We influence 20 million users and is the number one business and technology news network on the planet.

Find Us on Socials

News for IndiaNews for India
© Wealth Wave Designed by Preet Patel. All Rights Reserved.
  • BUSINESS